Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當前位置:

首頁 News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
午夜影放免费观看| 亚洲免费视频网站| 欧美性xxxxx极品老少| 亚洲精品美女久久久久99| 欧美精品在欧美一区二区| 亚洲精品自拍视频| 欧美成人在线免费| 亚洲成人网在线观看| 最近最好的中文字幕2019免费| 亚洲国产精品成人午夜在线观看 | 高清性色生活片97| 国产成人精品AA毛片| 韩国美女主播免费的网站| 国产另ts另类人妖| 美国大片免费收看| 十七岁在线观看资源网| 深夜放纵内射少妇| 亚洲欧美日韩另类| 最近2019免费中文字幕视频三 | 久99频这里只精品23热视频| 很污很黄能把下面看湿的文字| 三级韩国床戏3小时合集| 天堂√在线中文资源网| av片在线观看永久免费| 国产精品女上位在线观看| 麻豆人人妻人人妻人人片AV | 午夜dj在线观看免费高清在线| 特一级黄色毛片| 亚洲欧美视频在线观看| 最猛91大神ben与女教师| 久久精品国产亚洲精品2020| 我要看a级毛片| 丁香花免费高清视频完整版| 国农村精品国产自线拍| 337p日本欧洲亚洲大胆人人 | 日产精品卡一卡2卡三卡乱码工厂 日产精品卡二卡三卡四卡乱码视频 | 国产成人亚洲精品无码AV大片 | 岳打开双腿让我进挺完整篇| 四虎国产成人永久精品免费| 成人免费无码精品国产电影| 免费看一级性生活片|