Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當前位置:

首頁 News Industry information

Insulation work of medical device shell

Release time:2023-03-30

Medical diagnosis, measurement and treatment equipment using AC power supply may cause leakage current due to improper grounding and electrical insulation, which may expose patients and even medical staff to the risk of electric shock, burns, internal organ damage and arrhythmia. So do a good jobMedical device shellInsulation work.

美容儀器殼9.jpg


1. The equipment shall be manufactured and sealed to prevent contact with live parts and parts that may be live in a single fault state. If the bulb can be replaced without tools, it must be ensured to prevent contact with the live parts of the lamp when loading and unloading the bulb.


2. The position or size of any hole on the top cover of the medical device shell shall ensure that the test rod with a diameter of 4 mm and a length of 100 mm will not touch live parts when it is freely and vertically suspended in the access hole throughout its length.


3. When the handle, knob, control lever, etc. are removed, the conductor part of the operating mechanism of the control device can be touched. When the open circuit test voltage is not greater than 50V AC and the test current is not less than 1a, the resistance measured to the protective grounding terminal should not be greater than 0.2 Ω; Or it should be isolated from live parts by adopting a method of 17g in GB 9706.1-2007.


4. If the components with line voltage above 25V AC or 60V DC in the shell of the medical device cannot be disconnected from the power supply through the external main switch or the plug device that can be pulled out at any time, additional covers shall be used for protection, so that contact can be prevented even after the shell is opened, or when the spaces are separated and arranged, the "live" mark shall be clearly marked.


5. In order to prevent contact with live parts, the shell must be removed only with tools, otherwise an automatic device should be used when opening or removing the shell, so that these parts are not used.


6. When the device has a preset controller, it can be adjusted by the user with tools during normal use. The hole opened for adjusting these control devices shall be designed so that the adjusting tool cannot contact the basic insulation or any live parts in the hole, or any parts isolated from the grid power supply part only through the basic insulation but without grounding protection.


Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
欧美黄色第一页| 日本性生活网站| 亚洲欧美另类色图| 狠狠色综合网站久久久久久久高清| 午夜在线观看视频免费成人| 精品一久久香蕉国产二月 | 亚洲欧美日韩精品专区卡通| 欧美性色欧美a在线播放| 亚洲精品NV久久久久久久久久| 欧美夫妇交换完整版随便看| 亚洲国产精品嫩草影院| 欧洲mv日韩mv国产mv| 亚洲人成精品久久久久| 暖暖直播在线观看| 亚洲国产精品无码久久98 | 亚洲国产激情在线一区| 樱桃视频影院在线播放免费下载| 亚洲乱色伦图片区小说| 日韩在线视频线视频免费网站| 久久精品国产福利电影网| 日本中文字幕在线视频| 久久免费福利视频| 日本一二三区高清| 久久成人午夜电影mp4| 手机看片1024旧版| 久久久久成人精品免费播放动漫| 忍者刺客在线观看完整中文免费版| 一级毛片在播放免费| 大佬和我的365天2在线观看| 99久久免费中文字幕精品| 国产精品亚洲а∨无码播放 | 精品久久久久久无码中文字幕一区 | 上课公然调教h| 天天操天天干天天摸| bl道具play珠串震珠强迫| 国产精品视频第一区二区三区 | 日本高清免费中文字幕不卡| 久久久久久91| 好男人社区www在线视频| hdjapanhdsexxx| 国产精品亚欧美一区二区三区|